Posts and footings
3 posts
12 bags of 80 lb concrete (or 16 of 60 lb) for the footings
| Beams | 1 beam |
| Posts per beam | 3 |
| Concrete per footing | 2.36 cu ft |
| Concrete for all footings | 7.07 cu ft |
| 80 lb bags | 12 bags |
| 60 lb bags | 16 bags |
A planning estimate. Allowed beam and joist spans and footing size depend on lumber, load and soil; footings must reach below your local frost depth. Check your plans with the building department.